One traffic study report covers all rises in the building — add a rise for each (low-rise, high-rise, shuttle…), like adding groups. Click a rise to edit it; double-click to rename.
Scenario
%
Lift rise
One lift rise (group) per scenario — model low-, mid-, high- and sky-rise
groups as separate scenarios. The express zone is the floors this rise passes without serving;
those floors carry zero population for this rise (served by the lower zones), and the population
or NLA you enter is spread across the rise's full height (express + served).
floors
ppl
m
Population
ppl
m²
m²/p
ppl
%
Lift group
floor(s)
kg
%
Kinematics
m/s
m/s²
m/s³
Doors & transfer
s
s
s
s
s
Levelling & door dwell — default 0 (efficient modern baseline); set only to model a specific installation's measured timing.
s
s
s
Andy · optimise
Searches practical designs (≤8 cars, speed sized to the rise, standard rated loads) for the scenario's target grade.
Energy & modernisation
Modelling this project's lift & escalator energy too? Continue it in MAPLE Ascent EnergyCalc Studio — the project name carries over.
Planning the lift core for this project? Size car, shaft, pit and overhead in MAPLE Ascent Spatial Studio — the project name and rated load carry over.
CIBSE Guide D round-trip hand calculation for conventional (2-button) control. Destination
control has no published hand-calc equivalent — its benefit is shown by simulation below.
PCA office quality grade — lifts (3rd ed. 2019)
Benchmarks per the Property Council of Australia Guide to Office Building Quality, section E (3rd ed. 2019).
Method per the published Australian industry consensus: 1-hour runs at the
target grade's demand, E3 waits taken from the worst 5-minute period; density 1 person/12 m² NLA, cars ≤ 80% by mass.
E2 (ride quality) and E5/E6 (goods lifts) sit outside a traffic study.
ISO 8100-32:2020 — simulation method
Method per ISO 8100-32:2020 cl. 8.2–8.4: per traffic mix, constant-demand runs at the required handling capacity and
+1/+2 %; each 120 min with the first 15 min and last 5 min excluded; criteria per Table 3. Encoded with attribution and
cross-checked against published ISO 8100-32 guidance summaries — confirm against a
licensed copy of the standard for contractual use.
Step profile — handling capacity by simulation
Demand rises in 1%-point steps (10 min each) to beyond the design value; the system has saturated where queues grow
without bound — waits spike while the interval stays nearly constant (CIBSE Guide D ch 4).
Measured capacity is approximate (single seed).
Conventional vs Destination dispatch — simulated
Average wait
—
destination vs conventional
Handling capacity
—
up-peak, saturated · %POP / 5 min
Conventional collectiveDestination dispatch
A
AndyOnline
AI assistant · Intelligent solutions for the future of lifts
Performance charts — queuing over time, waiting-time & time-to-destination distributions, demand-vs-capacity sweep
Car-activity timeline (gantt)
ISO 8100-32 & PCA assessment verdicts
Building mud map — NLA, population & lifts served, per rise
Method, basis & standards (CIBSE / ISO / EN / AS / PCA)
Building mud map (preview)
A$500 ex GST
per building report — covers all 1 rise(s)
Total: A$500 ex GST
One traffic study report covers all rises in the building — you pay once per building, not per rise.
Once payment is processed, a single-use access code for this project is emailed to you. The PDF prints once per access code — to print again you purchase another, so review the report carefully before you print.
Have a licence key? Attach your study data
Enter your licence key to attach this study to your report — the key authenticates the upload and opens your report.